Consulting Fees and Project Pricing, Explained Clearly
Every property receives a written quote. FHA 203(k) fees follow applicable HUD and lender requirements; every other loan or funding type is priced according to its required scope, forms, travel, deliverables, and schedule.
HUD maximums are reference ceilings only for applicable FHA 203(k) services—not prices for every loan type. Private-service starting prices cover the listed scope. Expanded work, additional visits, and travel are quoted separately. Your final written quote governs. The current IRS rate shown applies to qualifying travel on or after July 1, 2026; DolaOS stores the effective rate for each actual visit.
Service
Fee basis
Published reference
Choose
Standard 203(k) example package
One initial inspection + WWU/SOR for repairs of $50,000 or less + five draws
A card charge opens only after DolaOS validates the property, lender or assignment requirements, service area, conflict screen, payment source, and written price. Lender-paid or financed fees are not also collected by card.
01
How non-203(k) consulting is priced
North Texas starting fees are $995 for a renovation-loan starter documentation package, $495 for one contractor bid alignment review, and $350 for one oversight visit with a report. The published service details define each starting scope. Additional work and travel are quoted separately. Private housing and renovation consulting is quoted by the requested deliverable, property complexity, review time, site visits, travel, supporting documents, and turnaround. The written quote identifies what is included, what is excluded, and what would require additional authorization.
02
Current FHA 203(k) maximum consultant fees
Feasibility Study: up to $375
WWU — repairs of $50,000 or less: up to $1,000
WWU — $50,001 to $85,000: up to $1,200
WWU — $85,001 to $140,000: up to $1,400
WWU — more than $140,000: the lower of 1% of repair cost or $2,000
Additional dwelling units: up to $25 per additional unit
Draw inspection: up to $375 per requested inspection
Change-order request: up to $120
Reinspection requested by the lender: up to $225
Fees shown are current reference maximums and can change. Your project quote governs, subject to HUD and lender requirements.
03
What the WWU fee covers
The Standard 203(k) initial inspection, WWU, Specifications of Repairs, and consultant cost estimate are shown together as the initial consultant package. HUD does not publish a separate generic initial-inspection fee in addition to the tiered WWU fee. Draw inspections follow later and are priced separately per requested and performed visit.
04
How the initial package connects to draws
The project begins with one initial consultant inspection. That inspection supports the WWU/SOR and cost estimate. Once the lender approves the rehabilitation baseline and construction progresses, draw inspections document completed line items against that same WWU/SOR.
Initial inspection + WWU/SOR fee: based on HUD's repair-cost tier
Draw inspection fee: up to $375 for each requested and performed draw
Example for repairs of $50,000 or less with five draws: $1,000 + (5 × $375) = $2,875
Mileage: added separately for each eligible, documented property visit
05
Draw fees are earned per inspection
For Standard 203(k), the current framework allows up to five draw requests: four intermediate draws and one final draw. A draw fee applies only when the inspection is requested and performed; it is not automatically earned at engagement.
06
Corrected four-property example
If each property has $50,000 or less in rehabilitation and receives one WWU plus five draw inspections at the published maximums, the calculation is $1,000 + (5 × $375) = $2,875 per property.
Four separate properties: 4 × $2,875 = $11,500, plus separately documented mileage for each applicable visit to each property. Draw fees alone would be 4 × 5 × $375 = $7,500, plus mileage.
Each property is a separate assignment and fee calculation. Actual draws, fees, travel, and lender approvals may differ.
07
How mileage works
When the consultant's place of business is more than 15 miles from the property and HUD permits mileage, the charge is calculated using the IRS business-mileage rate effective on the service date. The current reference is $0.76 per mile for qualifying travel on or after July 1, 2026. The quote states the starting point and method. Each trip is documented by date, property, purpose, miles, and effective rate.
08
What your written quote will show
Property address and requesting party
Requested service and assumed loan track
WWU tier or standalone service fee
Expected draw or reinspection structure
Mileage method and starting point
Payment timing, exclusions, and conditions requiring a revised quote
Project questions
Frequently asked questions
Next step
Get a property-specific fee quote
Send the address, estimated repair amount, lender, loan track, and requested service. We will reply with assumptions and a written fee structure.